Hot off the press!

Fall 2011
Click to view or Right-click to save!

See archive for back issues.

BLHA Output

2012 Schedule

  • Jan 7 Annual Membership Meeting and Dinner
  • Jan 22 Polar Bear Plunge
  • Feb 11 Valentine's Dance
  • Mar 3 Beach Clean-up
  • Mar 17 St. Patrick's Day O'BLFF
  • Mar 21 Senior Luncheon
  • Mar 17 Picnic Area Clean-up
  • Apr 8 Easter Sunrise Service / BLOSOMS Easter Egg Hunt
  • Apr 21 Earth Day
  • May 19 Spring Event (membership meeting)
  • Jul 4 Parade and Picnic
  • Sep 15 Fall Event (membership meeting)
  • Oct 13 Chili Cook-off at the Beach
  • Dec 16 Holiday Party (membership meeting)
  • Jan 5, 2013 Annual Membership Meeting and Dinner
Berkeley Lake Shoreline Improvement PDF Print E-mail
Written by Steve Seitz   
December 2009

The City of Berkeley Lake has lowered the lake by ten (10) feet. BLHA and property owners have the opportunity to perform a number of tasks while the lake is down, from repairs to new construction projects. With all of these comes the challenge of maximizing our available time, while minimizing the impact to our wallets and time with family and friends.

Property owners living along the lake and considering removing sediment themselves or contracting, are requested to contact BLHA to ensure you are informed on the current permits and regulations associated with handling and storage of this material.

In an attempt to assist you in these undertakings BLHA would like to provide the following information.

Our Top Ten List... Pease READ to see if you qualify for a $$$ DISCOUNT

  1. BLHA is attempting to identify lakeside property owners who are planning projects along the shoreline
  2. BLHA requests all property owners doing work along the shoreline send an email to the President of BLHA*
  3. Interested individuals are requested to contact your area "Cove Captains" or This e-mail address is being protected from spambots. You need JavaScript enabled to view it
  4. Property owners should be prepared to provide a detailed scope of work for planned projects:
    • Name / Address / Email / Telephone #(s) and best time to be contacted
    • Provide Scope of Work (SOW) and a list of any specific materials required for the project
    • Pictures / drawings / survey as deemed necessary to prepare for quoting
    • Permit Status
  5. Example of projects being scheduled include seawalls, sediment excavation, dock building or repair, tree removal, landscaping
  6. BLHA will be preparing a group RFP to solicit a minimum of three (3) bids from which property owners can select
    • Objective is to obtain favorable pricing along with ability to schedule projects efficiently and maintain overall service and quality workmanship
  7. Property owners are responsible for obtaining permits, contact City Hall at 770.368.9484
    • Tree Permit
    • Land Disturbance Permit
    • Building Permit
  8. In some instances, a variance may be required from the City of Berkeley Lake, P&Z Commission
    • If in doubt, contact City Hall, Leigh Threadgill, at 770.368.9484 Mon-Thur 11am – 4pm
  9. P&Z variances can take several weeks to schedule and be heard
    • Requires completing a Variance Request Form, plus a $50 check
    • Submission of applicable drawings / documents Posting of a public notice
    • Attending the monthly P&Z Commission meeting at City Hall
  10. Remember... BLHA Membership is only $200 annually. As a BLHA Member, your membership will entitle you to a discount to be applied to services quoted.